The Challenge

CK Services was asked by a leading building and shopfitting company to strip out the old system and install a new heating and air conditioning system for the new flip out park, based in Blackburn Lancashire.
The Solution
Our first job was to remove the old large ventilation system that was installed and needed to be removed as the building was being changed from an indoor football practice arena into a new trampoline park.

The second part of the project heating for the main area we designed the system using 2 high efficiency Powrmatic NVX 140’s painted black to match the interior as well as 6 Powrmatic CECX 1400 de-stratification fans fitted with thermostats to save on wasted heat being stuck in the roof space. The heaters are both controlled with 2 Energy Saving Heatmiser IQ+ energy saving control panels again locked down to opening times and a set temperature to save on wasted gas usage. We supplied the heaters, fans, flues, gas pipe work, cable, control and installed the full system and commissioned.

The Result
The building was also struggling to get enough gas for the new heating system so we worked along with the client and Calor to provide 2 LPG gas tanks outside for the heaters so as off the grid gas could be used to heat the building.

As well as installing the main heating for the play area we also designed and installed various Toshiba Air Conditioning units in the canteen, offices and changing and training rooms. We installed designed and installed all the ventilation as well as the Air Conditioning for the rooms and canteen.

Do you need expert product selection and advice?
Then contact CK Services to arrange your FREE no obligation site survey, heating load assessment and equipment recommendation service.

Share this case study

More Case Studies

Sports Centres, Gyms Heating & Cooling

Unite Martial Arts – Southport

Suspended Gas Heating